Project Overview
[Building Area]: 136m2
[Design Room Type]: Three Rooms, Two Rooms, Two Bathrooms, One Kitchen
[Family members]: a family of three
[Select Host]: Brugge Bi-directional Dehumidification Fresh Air Machine
01, pre-
Designing the bottom, interior communication, drawing modification
02, Positioning Punch
< /span>
The purpose of positioning is to prevent the impact of the late punching, and communicate with the owner, the supervisor and the property party in advance. The direction of the pipe is selected without affecting the structure and ensuring the effect, and the position of the hole is determined.
03, Host Installation
The host needs to leave a 600*600 access port to ensure that there is enough disassembly space on the disassembly side of the filter section, compressor module, etc. The reserved service port direction shall not have any obstructions in the direction of the wall 650 for later maintenance.
04, Pipeline Installation
< /span>
The pipe and equipment are connected by a special muffler hose, and the joint is sealed with special tape or aluminum foil tape to prevent air leakage. .
< /span>
When the equipment connection is completed, Bruglin will be on hand with our customers and the decoration company for debugging. Focused, forgot to take a photo, took two photos of the installation master toolbox, I feel very good-looking, very tall and noble.